Draft table estimating 2040 water and sewer demand under three growth projections and the wastewater treatment plant (WWTP) capacity needed for each: at least 1.18 million gpd for Projection 1, 1.66 million gpd for Projection 2, and 1.25 million gpd for Projection 3. The figures note they include actual flows plus commitments to provide service equivalent to 26,000 gpd.
2040 projectionwater capacitysewer capacityWWTP capacity1.18 million gpd1.66 million gpd26,000 gpd commitments
AI-generated summary — verify against the source document.
Full extracted text
The document's complete text, exactly as extracted — not a summary. Use “Summarize this document” above for the short version.
DRAFT Impact of Projected Growth: Water and Sewer Capacity 2040 Projection 1 2040 Projection 2 2040 Projection 3 Community Facility Non- Non- Non- Existing % Use in Capacity Demand1 2022 Residential Residential Capacity % Use in Residential Increased Capacity % Use in Residential Increased Capacity % Use in Increased Increased Remaining Increased Remaining Increased Demand Remaining 2040 Demand (gpd) 2040 2040 Demand Demand (gpd) (gpd) Demand (gpd) Demand (gpd) (gpd) (gpd) (gpd) (gpd) Public Water (gallons per day) Public Sewer (gallons per day)2 5 42,000 5 03,000 93% 2 5,000 1 11,000 ( 183,000) 118% 2 5,000 5 93,500 ( 579,500) 207% 2 5,000 178,500 ( 164,500) 130% A WWTP with a capacity of at least 1.18 million gpd would be A WWTP with a capacity of at least 1.66 million gpd would be A WWTP with a capacity of at least 1.25 million gpd Implications required. required. would be required. 1Includes actual flow plus commitments to provided service equivalent to 26,000 gpd.