september 16 2020 planning commission meeting - part 2
Other September 16, 2020 · 8 page(s)
Notes from the September 16, 2020 Planning Commission meeting (Part 2) presenting a land-use framework that moves from Growth Area to Villages to Neighborhoods, maps recommended employment zones, planned and existing institutional/commercial/residential areas, planned major streets, and locations for future schools and parks. The document also lists housing growth figures (740 inside and about 4,970 in the growth area) and policies to coordinate housing growth with water/sewer, promote infill and rehab, provide varied housing types, and ensure affordable quality housing and complete, walkable neighborhoods with interconnected open space.
Full extracted text
The document's complete text, exactly as extracted — not a summary. Use “Summarize this document” above for the short version.
From Growth Area to Villages to Neighborhoods Recommended Employment Zones P Existing Intuitional uses S Planned Commercial / Mix P Residential InfillAreas Planned Complete Neighborhoods NewStreets PlannedGrowth Area S P Boundary S P Possible Employment Zone P S Future School P Future Park Planned Major Street Network Existing Planned Housing Growth 740 inside and from about 4,970 in growth area 1. Planned housing growth coordinated with water and sewer 2. Promote infilling of vacant lots, tracts and rehabbing existing houses 3. Promote a variety of housing types in each new neighborhoods 4. Promote quality housing that is affordable to low-and-moderate- income households and seniors throughout the Town Complete Neighborhoods • A variety of housing types • Neighborhood level commercial uses • Parks • Institutional uses • Walkable • Interconnected with open space • Interconnected with streets playground Special Destination Park Major Park ballfields Planned Open Spaces and Relationship to Housing Interconnecting Park Note housing types fronting park Employment Zones