Sign in

← All documents

housing developments residential land use on large infill tracts

Other March 15, 2023 · 16 page(s)

View original PDF ↗ Meeting

Presentation materials for the March 14, 2023 Planning Commission meeting compare the Town’s conventional residential zoning (R-1, R-2, R-3) with the Planned Unit Development (PUD, Section 170-28) approach and note that the draft comprehensive plan encourages PUDs, recommends requiring them on large tracts, simplifying the approval process, and keeping the Planning Commission and Town Council in their traditional roles. The packet also reviews recent large-tract proposals — Turpin (56 acres, R-3, est. 290 units, actual 166 units), Carter (44 acres, TND, est. 215 units, actual 126 units), and a revised proposal of 138 units versus an earlier 227-unit plan — showing gross and net densities after subtracting resource areas.

PUD (Section 170-28)R-1/R-2/R-3 zoningTurpinCarterdraft comprehensive plandensity (gross vs net)resource areasPlanning Commission
AI-generated summary — verify against the source document.

Full extracted text

The document's complete text, exactly as extracted — not a summary. Use “Summarize this document” above for the short version.

Presentation materials March 14, 2023
Planning Commission Meeting
on the draft comprehensive plan
Topic: Housing Developments and Residential Land Use on Large Infill
Tracts

The Town’s
R-1
Conventional
Approach
Symphony Village North Brook
(cluster subdivision)
“Elderly Housing” Single-family Detached houses
at 6 units per acre
Min lot size = 15,000 sq. ft. (or 10,000 sq. ft. if
“clustered”)

The Town’s Conventional
R-2
Approach
Providence Farm
Centreville Heights
Single-family Detached houses Single-family detached houses
Min. size = 8,000 sq. ft. Min. lot size = 8,000 sq. ft.

Providence Farm
The Town’s Conventional
R-3
Willows at Centreville
Approach
Centreville Heights
Center Park
Apartments
Multi-family housing developments Multi-family housing developments
At up to 8 units/acre At up to 8 units/acre

PUD Approach
Section 170-28 of the Zoning Ordinance
The intent is to promote better residential development than could be possible through the strict zoning and
subdivision standards applicable to R1, R-2, R-3,and TND zones.
• More attractive living environments.
• Encourage more intimate, efficient, and aesthetic use of open space.
• More creative approaches to land development.
• Offer a variety of building types and better design.
• More and better open space.
• Encourage more sustainable development practices.

PUD Approach
Section 170-28 of the Zoning Ordinance
PUD zone “floats” over a parcel and can settle
down on it if approved by the Town Council.
PUD
Allows different housing types and a limited
amount of commercial development.
Allows the Town to require institutional and
recreational uses, public uses, and the reservation
of land for them.
It caps the number of units at the max level that
would be allowed in the underlying zone: 3 units
per acre in R-1, 5 units per acre in R-2 and TND
zones, 8 units per acre in R-3.
PUD’s do not increase the allowable density.

PUD Approach
Section 170-28 of the Zoning Ordinance
• PUDs are optional . The owner/developer applies for a PUD. If applied for, then a review/approval process is
started.
• PUDs are approved through a complicated approach involving meetings and public hearings by both the
Planning Commission and Town Council.
• The Town Council reviews a general development plan and a preliminary site (development) plan. This
places the Council in the plan review role that the Planning Commission typically occupies.
• Approving a PUD in Centreville is like approving a zoning map change along with all the zoning and site
development standards that will apply to the development….while reviewing a subdivision plat.

What does the Draft Comp Plan say about PUDs
• The Plan encourages PUDs as the preferred approach to development, but…
• The Plan recommends that they be required on large tracts of land … not optional and not up to the
developer.
• The Plan recommends a less complicated administrative approach. Rather than treating the PUD like a
zoning map change, the expectations for a PUD would be codified into the Ordinance.
• The Plan recommends that the Planning Commission and Town Council maintain their traditional roles: The
Commission would administer the zoning laws adopted by the Council. The Council would be above the
development plan review and approval process.
• PUDs = a tool for bringing about smarter development aligned with the goals of the Comp. Plan—”Complete
Neighborhoods”.

A quick review of recent development proposals and what the
Comp Plan says:

Turpin
56 acres
Zoning: R-3
Est. Potential Build-out per Table 2: 290 units

This proposal has the max. density of an R-
1, but the design flexibility of a PUD
ACTUAL PLAN: 166 units
3.0 units/acre (gross)
(-25 acres resource area)
5.35 units/acre (net)

Carter
44 acres (in Town)
Chesterfield
Ave.
Zoning: TND
Est. Potential Build-out per Table 2: 215 Units

This proposal has the max. density of an
R-1, but the design flexibility of a PUD
ACTUAL PLAN: 126 units
2.9 units/acre (gross)
-14 acres of resource areas
4.2 units/acre (net)

This proposal has slightly more density
ACTUAL PLAN: 138 units
than an R-1, but the design flexibility of
a PUD
3.1 units/acre
-14 acres resource areas
4.6 units/acre (net)

This proposal has slightly more density
than an R-1, but the design flexibility of
a PUD
ACTUAL PLAN: 138 units
3.1 units/acre (gross)
-14 acres resource
4.6 units per acre (net)
This Plan revised an earlier plan for
227 units or
7.6 units/acre (net)
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.